logo
top
Home

Features & Facilities

Turn Over      
bar
d d
project information
left Project Info right
Project Info
Features & Facilities
Walk Thru
Contact_Us
6_blank
Sitemap
lobby
leftab icon Announcements:
Visit our model units located at the third level (near Chef’s Avenue), Festival Supermall, Filinvest Corporate City, Alabang.
icon Building Features
  • Ground floor main lobby for Commercial Retail & Office units
  • Separate ground floor lobby for Small Office Home Office units
  • Commercial Retail establishments with direct individual access from the street & main roads
  • 24-hour security center
  • Individual mail pigeon holes
  • Integrated multi-level basement parking
  • Elevator for Commercial Retail and Office units
  • Two elevators for Small Office Home Office units
  • Centralized garbage disposal system
  • Automatic fire alarm and sprinkler system
  • Standby generator
  • Underground and overhead water storage tanks

ELECTRICAL SYSTEM

  • Adequate electrical loads provision for high demand use
  • Standby generator set for common areas

COMMUNICATIONS SYSTEM

  • Adequate telephone lines provision and guaranteed telephone services
  • Provision for Cable TV connection

SANITARY SYSTEM

  • Underground and overhead water storage tanks
  • Provision for individual toilets for Commercial Retail units
  • Common toilet facilities with toilet for handicapped at Office levels
  • Provision for an executive toilet for specific units in the Commercial Office level
  • Individual toilets and bath for Small Office Home Office units

FIRE SAFETY SYSTEM

  • Automatic smoke and heat detectors with sprinklers
  • Fire alarm system with dry standpipe for fire department connections
  • Two fire escape routes and pressurized stairs in case of fire

icon Facilities & Technical Specifications

 

Facilities

  1. Ground Level - Commercial Retail Units
    • Individual access from the outside, except for inner units
    • Provision for outdoor signage
    • Provision of stub-outs for comfort room and pantry
    • Provision for refrigerant pipes for split type ACUs
       
  2. Second Level – Commercial Office Units
    • Provision for outdoor signage
    • Provision of stub-outs for comfort room and pantry for specific units
    • Provision for expansion by combining adjacent units
    • Provision for window or centrifugal split type ACUs
       
  3. Third & Fourth Level – Office Units
    • Operable windows provide natural ventilation for all units Large glass windows for ample lighting and outdoor views
    • Provision for expansion by combining adjacent units
    • Common toilet facilities
    • Provision of stub-out for pantry
    • Provision for window or centrifugal split type ACUs
       
  4. Fifth to Tenth Level – Small Office Home Office
    • Wide operable windows provide natural ventilation for all units
    • Individual toilet facilities
    • Provision for expansion by combining adjacent units
    • Provision of stub-out for pantry
    • Provision for window or centrifugal split type ACUs

Specifications

Exterior Finishes

  • Concealed aluminum framed tinted glass windows
  • Composite aluminum cladding accents at podium level & towers
  • Curtain wall windows
  • Granite Stone cladding at ground level for accent
  • Homogenous non-skid paver floor tiles

Interior Finish
Common Areas

  1. Ground Floor

    Main Lobby / Elevator Lobby
    Floor : Granite Tiles
    Wall : Plain cement plaster finish- painted with chair rail and baseboard
    Ceiling : Gypsum board with cornices, painted

    Hallway
    Floor : Homogenous floor tiles Wall : Plain cement plaster finish, painted with chair rail and baseboard Ceiling : Gypsum board with cornices, painted

  2. Typical Floor

    Elevator Lobby/Hallway
    Floor : Homogenous floor tiles
    Wall : Plain cement plaster finish, painted with chair rail and baseboard
    Ceiling : Gypsum Board with cornices, painted

 

icon Turnover Conditions

GROUND LEVEL –COMMERCIAL RETAIL UNITS

Floor : Bare Concrete
Wall : CHB wall, plain cement plaster finish, painted
Ceiling : Smooth rubbed concrete finish, painted
Door : Frameless glass door

SECOND LEVEL – COMMERCIAL OFFICE UNITS

Floor : Bare Concrete
Wall : CHB wall, plain cement plaster finish, painted
Ceiling : Smooth rubbed concrete finish, painted
Door : Frameless glass door

THIRD TO TENTH LEVEL – OFFICE & SMALL OFFICE HOME OFFICE UNITS

Floor : Vinyl floor tiles
Wall : CHB wall, plain cement plaster finish, painted, with PVC baseboard
Ceiling : Smooth rubbed concrete finish, painted
Door:
  • Aluminum framed unit door(3rd and 4th level)
  • Solid wood panel doors for unit entrances (5th to 10th level)
Toilet & Bath ( for 5th to 10TH level only)

Floor : Vitrified unglazed ceramic tiles
Wall : Glazed ceramic tiles
Ceiling : Drop ceiling, Water resistant gypsum board, painted
Door : PVC flush door with louvers
Fixtures :
  1. Vitreous China water closet complete with seat & cover
  2. Wall-hung lavatory, ceramic
  3. Shower
 
 
fai